Project Details
This page displays current information for project DEA: 060W9104.
Project Information
| Project Identifiers | Project ID: 995239 DEA: 060W9104 EFIS: 0618000011 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-99-27.6/30.6 |
| Award Date | 09/17/2024 |
| Closeout Date | 05/20/2026 |
| Work Description | HMA, RHMA-G, JOINTED PLAIN CONC PVMT (RSC) AND STBB (TYPE M). |
| Location Description | TULARE COUNTY IN AND NEAR TULARE FROM PAIGE AVENUE OVERCROSSING TO PROSPERITY AVENUE OVERCROSSING. |
| QA Service Level | 1 (Verified on 10/14/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| amir.zamanian@dot.ca.gov | Amir Zamanian | Resident Engineer | Caltrans RE DB |
| raafat.shehata@dot.ca.gov | Raafat Shehata | District Materials Engineer | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 81-90 of 115 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-05-14-16 | 05/14/2025 | 05/15/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-05-14-15 | 05/14/2025 | 05/15/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-05-13-25 | 05/13/2025 | 05/14/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-05-13-24 | 05/13/2025 | 05/14/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-05-13-23 | 05/13/2025 | 05/14/2025 | Quality Assurance | Aggregate | View |
| 2025-05-13-2 | 05/13/2025 | 05/13/2025 | Quality Assurance | Aggregate | View |
| 2025-05-12-22 | 05/12/2025 | 05/13/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-05-12-21 | 05/12/2025 | 05/13/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-05-08-24 | 05/08/2025 | 05/09/2025 | Quality Assurance | Aggregate | View |
| 2025-05-08-23 | 05/08/2025 | 05/09/2025 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
