Project Details
This page displays current information for project DEA: 11430244.
Project Information
| Project Identifiers | Project ID: 994903 DEA: 11430244 EFIS: 1118000033 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-125-9.3/13.0 |
| Award Date | 09/06/2023 |
| Closeout Date | Not set |
| Work Description | PLACE HMA, RHMA, SLAB REPLACEMENT, AND ELECTRICAL WORK. |
| Location Description | SAN DIEGO COUNTY IN AND NEAR LEMON GROVE FROM 0.3 MILE SOUTH OF ELKELTON PLACE UNDERCROSSING TO 0.2 MILE SOUTH OF ROUTE 125/94 SEPARATION |
| QA Service Level | 1 (Verified on 11/14/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| sultan.ghazialam@dot.ca.gov | Sultan Ghazialam | Resident Engineer | Caltrans RE DB |
| julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 81-90 of 112 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-09-29-6 | 09/29/2024 | 10/03/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-09-12-58 | 09/12/2024 | 09/12/2024 | Quality Control | Aggregate | View |
| 2024-09-18-43 | 09/18/2024 | 09/19/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-09-18-42 | 09/18/2024 | 09/18/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-09-12-39 | 09/12/2024 | 09/12/2024 | Quality Control | Aggregate | View |
| 2024-09-08-28 | 09/08/2024 | 09/08/2024 | Quality Control | Aggregate | View |
| 2024-09-04-85 | 09/04/2024 | 09/04/2024 | Quality Control | Aggregate | View |
| 2024-08-29-18 | 08/29/2024 | 08/30/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-08-29-17 | 08/29/2024 | 08/28/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-08-26-39 | 08/26/2024 | 08/28/2024 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
