Project Details
This page displays current information for project DEA: 11423704.
Project Information
| Project Identifiers | Project ID: 993318 DEA: 11423704 EFIS: 1116000059 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-8-R31.8/R41.7 |
| Award Date | 04/01/2022 |
| Closeout Date | 04/08/2025 |
| Work Description | PLACE CRCP, HMA, MGS, AND WATER POLLUTION CONTROL SYSTEM. |
| Location Description | SAN DIEGO COUNTY NEAR ALPINE FROM VIEJAS CREEK BRIDGE TO PINE VALLEY CREEK BRIDGE |
| QA Service Level | 1 (Verified on 10/27/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| arashdeep.pannu@dot.ca.gov | Art Pannu | Resident Engineer | Caltrans RE DB |
| carlos.guzman@dot.ca.gov | Carlos Guzman | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 81-90 of 128 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-07-02-35 | 07/02/2024 | 07/03/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-12-97 | 10/12/2023 | 10/12/2023 | Quality Control | Aggregate | View |
| 2023-10-31-82 | 10/31/2023 | 11/03/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-31-81 | 10/31/2023 | 11/03/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-27-86 | 10/27/2023 | 11/03/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-27-85 | 10/27/2023 | 11/03/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-30-80 | 10/30/2023 | 11/03/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-30-79 | 10/30/2023 | 11/03/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-11-10-52 | 11/10/2023 | 11/10/2023 | Quality Control | Aggregate | View |
| 2023-10-27-26 | 10/27/2023 | 10/31/2023 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
