Project Details
This page displays current information for project DEA: 07316004.
Project Information
| Project Identifiers | Project ID: 214649 DEA: 07316004 EFIS: 0715000194 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-14-60.70 |
| Award Date | 02/07/2023 |
| Closeout Date | Not set |
| Work Description | REHABILITATION FOR THE ON/OFF RAMPS AND ADJACENT SHOULDERS. UPGRADING METAL BEAM GUARDRAILS, AC DIKES, SIGN PANELS, CURB RAMPS, TRAFFIC LOOPS DETECTORS, AND SOME OTHER HIGHWAY APPURTENANCES. |
| Location Description | ROUTE 14 FROM PALMDALE BLVD TO KERN COUNTRY LINE. |
| QA Service Level | 1 (Verified on 01/29/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| james.w.shih@dot.ca.gov | James Shih | Resident Engineer | Caltrans RE DB |
| hossein.sabbagh@bureauveritas.com | Hossein Sabbagh | Structural Representative | Caltrans SR DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 81-90 of 1476 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-10-08-47 | 10/08/2025 | 10/13/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-10-07-59 | 10/07/2025 | 10/10/2025 | Verification | Asphalt Rubber Binder | View |
| 2025-10-07-58 | 10/07/2025 | 10/10/2025 | Verification | Asphalt Binder | View |
| 2025-07-31-67 | 07/31/2025 | 07/31/2025 | Quality Assurance | Concrete | View |
| 2025-10-07-37 | 10/07/2025 | 10/10/2025 | Verification | Crumb Rubber Modifier | View |
| 2025-08-21-92 | 08/21/2025 | 08/21/2025 | Quality Assurance | Concrete | View |
| 2025-08-21-91 | 08/21/2025 | 08/21/2025 | Quality Assurance | Concrete | View |
| 2025-10-07-36 | 10/07/2025 | 10/10/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2025-10-07-35 | 10/07/2025 | 10/10/2025 | Verification | Crumb Rubber Modifier | View |
| 2025-08-21-90 | 08/21/2025 | 08/21/2025 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
