Project Details
This page displays current information for project DEA: 043G9004.
Project Information
| Project Identifiers | Project ID: 209109 DEA: 043G9004 EFIS: 0412000557 COOP: 042513 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-116,121-46.0/46.7,5.8/R7.4 |
| Award Date | 07/31/2023 |
| Closeout Date | Not set |
| Work Description | MODIFY EXISTING STATE ROUTE 116,121 BONNEAU ROAD INTERSECTION FROM A 4 WAY STOP CONTROLLED INTERSECTION TO A ROUNDABOUT AND SIGNALIZED INTERSECTION. |
| Location Description | SONOMA COUNTY |
| QA Service Level | 1 (Verified on 08/15/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| fabio.laserna@dot.ca.gov | Fabio La Serna | Resident Engineer | Caltrans RE DB |
| waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 81-90 of 101 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-07-23-119 | 07/23/2024 | 07/23/2024 | Per Request | Soil | View |
| 2024-07-23-118 | 07/23/2024 | 07/23/2024 | Per Request | Soil | View |
| 2024-07-23-117 | 07/23/2024 | 07/23/2024 | Per Request | Soil | View |
| 2024-07-23-111 | 07/23/2024 | 07/23/2024 | Per Request | Soil | View |
| 2024-07-23-110 | 07/23/2024 | 07/23/2024 | Per Request | Soil | View |
| 2024-07-23-109 | 07/23/2024 | 07/23/2024 | Per Request | Soil | View |
| 2024-07-18-83 | 07/18/2024 | 07/18/2024 | Per Request | Soil | View |
| 2024-07-17-103 | 07/17/2024 | 07/17/2024 | Per Request | Soil | View |
| 2024-06-24-127 | 06/24/2024 | 06/24/2024 | Per Request | Soil | View |
| 2024-06-20-186 | 06/20/2024 | 06/20/2024 | Quality Assurance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
