Project Details
This page displays current information for project DEA: 080K1224.
Project Information
Project Identifiers | Project ID: 214486 DEA: 080K1224 EFIS: 0815000244 |
---|---|
DIST-CO-RTE-PM | 08-SBD-15-R28.6/37.5 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | REHBILIATATE EXISTING MAINLINE AND RAMP PAVEMENT |
Location Description | SAN BERNARDINO COUNTY IN HESPERIA AND VICTORVILLE FROM OAK HILL ROAD OVERCROSSING TO 0.1 MILE SOUTH OF BEAR VALLEY ROAD OVERCROSSING |
QA Service Level | 1 (Verified on 06/23/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Larry.Canuti@dot.ca.gov | Larry J Canuti | Resident Engineer | Caltrans RE DB |
taghreed.al-khateeb@dot.ca.gov | Taghreed Al-khateeb | Structural Representative | Caltrans SR DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 791-800 of 1521 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-09-13-38 | 09/13/2023 | 09/15/2023 | Department Acceptance | Hot Mix Asphalt | View |
2023-09-14-26 | 09/14/2023 | 09/18/2023 | Department Acceptance | Hot Mix Asphalt | View |
2023-09-13-33 | 09/13/2023 | 09/15/2023 | Quality Assurance | Concrete | View |
2023-09-13-32 | 09/13/2023 | 09/15/2023 | Quality Assurance | Concrete | View |
2023-09-13-31 | 09/13/2023 | 09/15/2023 | Quality Assurance | Concrete | View |
2023-09-09-12 | 09/09/2023 | 09/09/2023 | Quality Assurance | Soil | View |
2023-09-09-11 | 09/09/2023 | 09/09/2023 | Quality Assurance | Soil | View |
2023-09-09-10 | 09/09/2023 | 09/09/2023 | Quality Assurance | Soil | View |
2023-09-09-9 | 09/09/2023 | 09/09/2023 | Quality Assurance | Soil | View |
2023-09-09-8 | 09/09/2023 | 09/09/2023 | Quality Assurance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-1 of 1 result.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
JMF3511-26-2022-6 | Submittal Accepted for Verification | CT D08 - Fontana Southern Regional Laboratory | 04/04/2022 | View |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods