Project Details
This page displays current information for project DEA: 040Q1004.
Project Information
| Project Identifiers | Project ID: 995026 DEA: 040Q1004 EFIS: 0418000044 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA-580-20.7/30.8 |
| Award Date | 07/11/2024 |
| Closeout Date | Not set |
| Work Description | REHAB ALA 580 |
| Location Description | ALAMEDA COUNTY IN PLEASANTON AND CASTRO VALLEY FROM ROUTE 680/580 SEPARATION TO ROUTE 580/238 SEPARATION |
| QA Service Level | 1 (Verified on 07/28/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| paramjit.pandher@dot.ca.gov | Paramjit Pandher | Resident Engineer | Caltrans RE DB |
| john.parecadan@dot.ca.gov | John Parecadan | Structural Representative | Caltrans SR DB |
| dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 71-80 of 85 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-08-25-40 | 08/25/2025 | 08/26/2025 | Quality Assurance | Aggregate | View |
| 2025-08-22-17 | 08/22/2025 | 08/25/2025 | Quality Assurance | Aggregate | View |
| 2025-08-18-43 | 08/18/2025 | 08/19/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-08-15-47 | 08/15/2025 | 08/18/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-08-20-49 | 08/20/2025 | 08/21/2025 | Quality Assurance | Aggregate | View |
| 2025-08-14-76 | 08/14/2025 | 08/15/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-08-13-69 | 08/13/2025 | 08/14/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-08-19-46 | 08/19/2025 | 08/20/2025 | Quality Assurance | Aggregate | View |
| 2025-08-12-84 | 08/12/2025 | 08/13/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-08-18-37 | 08/18/2025 | 08/19/2025 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
