Project Details
This page displays current information for project DEA: 081H3904.
Project Information
Project Identifiers | Project ID: 994588 DEA: 081H3904 EFIS: 0817000032 |
---|---|
DIST-CO-RTE-PM | 08-SBD-15-R20.5/R21.6,R25.5/R30.7 |
Award Date | 07/13/2023 |
Closeout Date | Not set |
Work Description | CONSTRUCT BUILDING, ROADWAY EXC, JPCP, AND TEMPORARY BARRIER SYSTEM. |
Location Description | SAN BERNARDINO COUNTY FROM 0.6 MILE NORTH OF CLEGHORN ROAD UNDERCROSSING TO 0.5 MILE SOUTH OF ROUTE 138 AND FROM 0.5 MILE SOUTH OF TRUCK SAFETY CHECK AREA TO 0.4 MILE NORTH OF OAK HILL ROAD OVERCROSSING |
QA Service Level | 1 (Verified on 08/02/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mauricio.santa-cruz@dot.ca.gov | Mauricio Santa Cruz | Resident Engineer | Caltrans RE DB |
oluwatayo.ogeyemi@dot.ca.gov | Oluwatayo (Tayo) Ogeyemi | Structural Representative | Caltrans SR DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 71-80 of 117 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-05-15-91 | 05/15/2024 | 05/15/2024 | Acceptance | Aggregate | View |
2024-05-07-71 | 05/07/2024 | 05/07/2024 | Acceptance | Aggregate | View |
2024-04-29-74 | 04/29/2024 | 04/29/2024 | Acceptance | Aggregate | View |
2024-04-29-73 | 04/29/2024 | 04/29/2024 | Acceptance | Aggregate | View |
2024-05-20-108 | 05/20/2024 | 05/20/2024 | Acceptance | Soil | View |
2024-05-20-107 | 05/20/2024 | 05/20/2024 | Acceptance | Soil | View |
2024-05-20-106 | 05/20/2024 | 05/20/2024 | Acceptance | Soil | View |
2024-05-20-105 | 05/20/2024 | 05/20/2024 | Acceptance | Soil | View |
2024-04-29-67 | 04/29/2024 | 04/30/2024 | Quality Control | Concrete | View |
2024-04-29-63 | 04/29/2024 | 04/30/2024 | Department Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods