Project Details
This page displays current information for project DEA: 060W15V4.
Project Information
Project Identifiers | Project ID: 994144 DEA: 060W15V4 EFIS: 0619000107 |
---|---|
DIST-CO-RTE-PM | 06-KER-58,204-R53.4/R54.5,R0.0/4.6 |
Award Date | 10/06/2022 |
Closeout Date | Not set |
Work Description | MODIFY SIGNAL AND LIGHTING SYSTEMS AND REPLACE CURB RAMPS. |
Location Description | KERN COUNTY IN BAKERSFIELD ON ROUTE 58 FROM SOUTH H STREET OVERCROSSING TO ROUTE 204 AND ON ROUTE 204 FROM ROUTE 58/204 SEPARATION TO L STREET |
QA Service Level | 1 (Verified on 07/28/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
trever.shiplee@nv5.com | Trever Shiplee | Resident Engineer | Caltrans RE DB |
ulysis.baal@dot.ca.gov | Ulysis Baal | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 71-80 of 208 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-10-24-36 | 10/24/2023 | 10/24/2023 | Department Acceptance | Soil | View |
2023-10-24-33 | 10/24/2023 | 10/24/2023 | Department Acceptance | Soil | View |
2023-10-24-31 | 10/24/2023 | 10/24/2023 | Department Acceptance | Soil | View |
2023-10-23-18 | 10/23/2023 | 10/23/2023 | Department Acceptance | Soil | View |
2023-10-23-17 | 10/23/2023 | 10/23/2023 | Department Acceptance | Soil | View |
2023-10-23-16 | 10/23/2023 | 10/23/2023 | Department Acceptance | Soil | View |
2023-10-23-15 | 10/23/2023 | 10/23/2023 | Department Acceptance | Soil | View |
2023-10-23-14 | 10/23/2023 | 10/23/2023 | Department Acceptance | Soil | View |
2023-10-23-13 | 10/23/2023 | 10/23/2023 | Department Acceptance | Soil | View |
2023-10-20-10 | 10/20/2023 | 10/20/2023 | Department Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods