Project Details
This page displays current information for project DEA: 034H5814.
Project Information
| Project Identifiers | Project ID: 993905 DEA: 034H5814 EFIS: 0320000240 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-5-27.6/29.5,30.4/34.3 |
| Award Date | 02/28/2023 |
| Closeout Date | 06/02/2025 |
| Work Description | ROADWAY EXCAVATION, PLACE CL2 AB, HMA & RHMA, & MODIFY RAMP METERS. |
| Location Description | SACRAMENTO COUNTY IN AND NEAR SACRAMENTO FROM 0.5 MILES SOUTH OF ARENA BOULEVARD OVERCROSSING TO 0.4 MILES SOUTH OF 99/5 INTERCHANGE AND FROM 0.5 MILES NORTH OF THE 99/5 INTERCHANGE TO 0.4 MILE SOUTH OF THE YOLO COUNTY LINE |
| QA Service Level | 1 (Verified on 06/27/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| hani.eissa@dot.ca.gov | Hani Eissa | Resident Engineer | Caltrans RE DB |
| brent_bullard@dot.ca.gov | Brent Bullard | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 71-80 of 149 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-06-07-67 | 06/07/2024 | 05/24/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-05-14-102 | 05/14/2024 | 05/24/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-05-16-90 | 05/16/2024 | 05/24/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-05-15-100 | 05/15/2024 | 05/24/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-05-14-101 | 05/14/2024 | 05/24/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-06-05-91 | 06/05/2024 | 06/05/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-06-05-90 | 06/05/2024 | 06/05/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-06-04-87 | 06/04/2024 | 06/05/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-06-10-63 | 06/10/2024 | 06/10/2024 | Quality Assurance | Concrete | View |
| 2024-05-08-73 | 05/08/2024 | 05/10/2024 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
