Project Details

This page displays current information for project DEA: 042Q8004.

Project Information

Project IdentifiersProject ID: 993678
DEA: 042Q8004
EFIS: 0419000050
COOP: 042836,042944
DIST-CO-RTE-PM04-SM-101,92-US 101 & SR 92-10.9/12.1 & 11.8/13.4
Award Date01/22/2025
Closeout DateNot set
Work DescriptionUS 101/SR 92 INTERCHANGE AREA IMPROVEMENT :PROJECT WILL CONSTRUCT CONGESTION RELIEF IMPROVEMENTS AT THE US 101/SR 92 INTERCHANGE AREA.
Location DescriptionNot set
QA Service Level1 (Verified on 09/15/2022)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
mohamed.fouad@dot.ca.govMohamed FouadResident EngineerCaltrans RE DB
bryan.nagid@dot.ca.govBryan NagidStructural RepresentativeCaltrans SR DB
waqas.ather@dot.ca.govWaqas AtherMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 71-80 of 122 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2025-09-09-7509/09/202509/09/2025Quality ControlConcreteView
2025-09-05-6709/05/202509/05/2025Quality ControlConcreteView
2025-09-04-6909/04/202509/04/2025Quality ControlConcreteView
2025-09-09-4909/09/202509/12/2025Quality AssuranceConcreteView
2025-08-11-5708/11/202508/11/2025Quality ControlConcreteView
2025-08-25-4408/25/202508/26/2025Quality AssuranceSMTL TM5 - Headed BarsView
2025-07-30-2307/30/202507/30/2025Quality AssuranceSoilView
2025-07-23-6107/23/202507/23/2025Quality ControlConcreteView
2025-07-23-6007/23/202507/23/2025Quality ControlAggregateView
2025-07-23-5907/23/202507/23/2025Quality ControlAggregateView

Job Mix Formula (JMF)

JMFs associated with this project.

Displaying 1-2 of 2 results.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
JMF3511-318-2025-54Submittal Accepted for Verification CT D04 - Hayward DME / District Laboratory08/14/2025View
JMF3511-318-2025-53Submittal Completeness Review Failed CT D04 - Hayward DME / District Laboratory08/14/2025View

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods