Project Details
This page displays current information for project DEA: 081C0824.
Project Information
| Project Identifiers | Project ID: 215349 DEA: 081C0824 EFIS: 0816000087 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-10-R104.9/R134.2 |
| Award Date | 03/24/2021 |
| Closeout Date | 01/06/2025 |
| Work Description | PLACE HMA (TYPE A), JPCP AND IMPORTED BORROW. |
| Location Description | RIVERSIDE COUNTY FROM ROUTE 10/177 SEPARATION TO 1.1 MILES WEST OF WILEY'S WELL RD OC |
| QA Service Level | 1 (Verified on 03/01/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| khoi.vu@dot.ca.gov | Khoi Vu | Resident Engineer | Caltrans RE DB |
| shukri.abouazra@dot.ca.gov | Shukri Abouazra | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 71-80 of 1326 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-11-14-51 | 11/14/2023 | 11/20/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-11-13-65 | 11/13/2023 | 11/20/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-11-03-43 | 11/03/2023 | 11/06/2023 | Verification | Asphalt Binder | View |
| 2023-11-03-32 | 11/03/2023 | 11/06/2023 | Verification | Aggregate | View |
| 2023-11-03-20 | 11/03/2023 | 11/06/2023 | Production Start-Up | Hot Mix Asphalt | View |
| 2023-11-02-34 | 11/02/2023 | 11/06/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-11-01-59 | 11/01/2023 | 11/06/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-10-18-39 | 10/18/2023 | 10/24/2023 | Verification | Asphalt Binder | View |
| 2023-10-20-32 | 10/20/2023 | 10/23/2023 | Verification | Asphalt Binder | View |
| 2023-10-18-32 | 10/18/2023 | 10/24/2023 | Production Start-Up | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
