Project Details
This page displays current information for project DEA: 051F5004.
Project Information
| Project Identifiers | Project ID: 214993 DEA: 051F5004 EFIS: 0514000003 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-101,135-70.6/71.2;0.1 |
| Award Date | 11/17/2020 |
| Closeout Date | 01/11/2024 |
| Work Description | CONSTRUCT CONCRETE BRIDGE, BRIDGE REMOVAL, COLD PLANE, PLACE HMA. |
| Location Description | SANTA BARBARA COUNTY AT LOS ALAMOS ON ROUTE 101 FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF ROUTE 101/135 SEPARATION AND ON ROUTE 135 AT ROUTE 101/135 SEPARATION |
| QA Service Level | 1 (Verified on 09/03/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jason.torres@dot.ca.gov | Jason Torres | Resident Engineer | Caltrans RE DB |
| alex.martinez@dot.ca.gov | Alex Martinez | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 71-80 of 85 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2021-12-16-6 | 12/16/2021 | 12/17/2021 | Quality Control | Concrete | View |
| 2021-11-09-42 | 11/09/2021 | 11/10/2021 | Quality Assurance | Concrete | View |
| 2021-12-16-2 | 12/16/2021 | Quality Control | SMTL TM5 - Welded Hoops | View | |
| 2021-12-16-1 | 12/16/2021 | 12/20/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2021-12-09-3 | 12/09/2021 | 12/10/2021 | Quality Control | Concrete | View |
| 2021-12-01-21 | 12/01/2021 | 12/02/2021 | Quality Control | Concrete | View |
| 2021-11-20-3 | 11/20/2021 | 11/22/2021 | Quality Control | Concrete | View |
| 2021-07-08-2 | 07/08/2021 | Quality Control | SMTL TM5 - Headed Bars | View | |
| 2021-07-08-1 | 07/08/2021 | 07/12/2021 | Quality Assurance | SMTL TM5 - Headed Bars | View |
| 2021-04-29-15 | 04/29/2021 | 04/30/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
