Project Details
This page displays current information for project DEA: 041A6614.
Project Information
| Project Identifiers | Project ID: 213099 DEA: 041A6614 EFIS: 0415000291 COOP: 042683A1 |
|---|---|
| DIST-CO-RTE-PM | 04-MRN-101-8.4 |
| Award Date | 11/30/2020 |
| Closeout Date | 12/12/2023 |
| Work Description | CONSTRUCTION ON STATE HIGHWAY IN MARIN COUNTY IN LARKSPUR |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 11/06/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| steve.russell@dot.ca.gov | Steven Russell | Resident Engineer | Caltrans RE DB |
| long.ly@dot.ca.gov | Long Ly | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 71-80 of 89 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2021-08-31-3 | 08/31/2021 | 09/07/2021 | Quality Control | SMTL TM5 - Couplers | View |
| 2021-08-31-2 | 08/31/2021 | 09/07/2021 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2021-08-31-1 | 08/31/2021 | 09/07/2021 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2021-06-15-62 | 06/15/2021 | 06/16/2021 | Quality Control | Concrete | View |
| 2021-08-10-2 | 08/10/2021 | 08/11/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2021-07-15-48 | 07/15/2021 | 08/06/2021 | Quality Assurance | Concrete | View |
| 2021-07-07-29 | 07/07/2021 | 08/06/2021 | Quality Assurance | Concrete | View |
| 2021-07-31-6 | 07/31/2021 | 08/06/2021 | Quality Assurance | Concrete | View |
| 2021-07-27-2 | 07/27/2021 | 08/02/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2021-07-12-1 | 07/12/2021 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
