Project Details
This page displays current information for project DEA: 073096U4.
Project Information
| Project Identifiers | Project ID: 214573 DEA: 073096U4 EFIS: 0719000091 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-210-R0.0/R9.7 |
| Award Date | 04/03/2020 |
| Closeout Date | 06/06/2024 |
| Work Description | PLACE CONCRETE PAVEMENT, BARRIER, HMA, DRAINAGE, AND ELECTRICAL. |
| Location Description | LOS ANGELES COUNTY IN LOS ANGELES FROM INTERSTATE 5 TO WHEATLAND AVENUE UNDERCROSSING |
| QA Service Level | 1 (Verified on 06/05/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| ridwan.salman@dot.ca.gov | Ridwan Salman | Resident Engineer | Caltrans RE DB |
| adriana.pimienta@dot.ca.gov | Adriana Pimienta | Structural Representative | Caltrans SR DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 691-700 of 753 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-01-07-19 | 01/07/2022 | 01/10/2022 | Quality Assurance | Aggregate | View |
| 2022-01-07-18 | 01/07/2022 | 01/10/2022 | Quality Assurance | Aggregate | View |
| 2022-01-19-2 | 01/19/2022 | 01/19/2022 | Per Request | Soil | View |
| 2022-01-14-9 | 01/14/2022 | 01/14/2022 | Department Acceptance | Soil | View |
| 2022-01-13-14 | 01/13/2022 | 01/13/2022 | Department Acceptance | Soil | View |
| 2022-01-13-13 | 01/13/2022 | 01/13/2022 | Department Acceptance | Soil | View |
| 2022-01-05-23 | 01/05/2022 | 01/05/2022 | Department Acceptance | Soil | View |
| 2022-01-18-5 | 01/18/2022 | 01/18/2022 | Per Request | Soil | View |
| 2022-01-17-5 | 01/17/2022 | 01/17/2022 | Per Request | Soil | View |
| 2022-01-12-10 | 01/12/2022 | 01/12/2022 | Department Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
