Project Details
This page displays current information for project DEA: 040K7804.
Project Information
| Project Identifiers | Project ID: 994368 DEA: 040K7804 EFIS: 0416000138 |
|---|---|
| DIST-CO-RTE-PM | 04-SM-84-21.5/25.7 |
| Award Date | 12/05/2023 |
| Closeout Date | Not set |
| Work Description | REPLACE AC SURFACING, UPGRADE CURB RAMPS, REPLACE MBGR WITH MGS. |
| Location Description | SAN MATEO COUNTY IN WOODSIDE AND REDWOOD CITY ON ROUTE 84 FROM ROUTE 280 TO ROUTE 101 |
| QA Service Level | 1 (Verified on 04/05/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mohamed.fouad@dot.ca.gov | Mohamed Fouad | Resident Engineer | Caltrans RE DB |
| waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 61-70 of 103 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-08-21-77 | 08/21/2024 | 08/22/2024 | Quality Assurance | Aggregate | View |
| 2024-08-20-67 | 08/20/2024 | 08/21/2024 | Quality Assurance | Aggregate | View |
| 2024-08-20-66 | 08/20/2024 | 08/21/2024 | Quality Assurance | Aggregate | View |
| 2024-08-19-61 | 08/19/2024 | 08/20/2024 | Quality Assurance | Aggregate | View |
| 2024-08-18-17 | 08/18/2024 | 08/20/2024 | Quality Assurance | Aggregate | View |
| 2024-08-18-16 | 08/18/2024 | 08/20/2024 | Quality Assurance | Aggregate | View |
| 2024-08-18-15 | 08/18/2024 | 08/20/2024 | Quality Assurance | Aggregate | View |
| 2024-08-15-75 | 08/15/2024 | 08/16/2024 | Quality Assurance | Aggregate | View |
| 2024-08-15-74 | 08/15/2024 | 08/16/2024 | Quality Assurance | Aggregate | View |
| 2024-08-15-73 | 08/15/2024 | 08/16/2024 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
