Project Details
This page displays current information for project DEA: 07322004.
Project Information
| Project Identifiers | Project ID: 994351 DEA: 07322004 EFIS: 0716000053 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-118-R11.0/R14.0 |
| Award Date | 01/11/2023 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT STORMWATER TREATMENT DEVICES. |
| Location Description | THE CITY AND COUNTY OF LOS ANGELES FROM 0.1 MILE WEST OF ARLETA AVENUE UNDERCROSSING TO 0.1 MILE WEST OF ROUTE 118/210 SEPARATION |
| QA Service Level | 1 (Verified on 06/08/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Wassem.Bakhet@dot.ca.gov | Wassem Bakhet | Resident Engineer | Caltrans RE DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 61-70 of 75 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-09-26-86 | 09/26/2023 | 09/26/2023 | Quality Assurance | Soil | View |
| 2023-11-13-12 | 11/13/2023 | 11/13/2023 | Department Acceptance | Soil | View |
| 2023-11-13-11 | 11/13/2023 | 11/13/2023 | Department Acceptance | Soil | View |
| 2023-11-09-25 | 11/09/2023 | 11/09/2023 | Department Acceptance | Soil | View |
| 2023-11-09-24 | 11/09/2023 | 11/09/2023 | Department Acceptance | Soil | View |
| 2023-06-01-130 | 06/01/2023 | 06/02/2023 | Quality Control | Concrete | View |
| 2023-11-08-18 | 11/08/2023 | 11/08/2023 | Department Acceptance | Soil | View |
| 2023-11-08-17 | 11/08/2023 | 11/08/2023 | Department Acceptance | Soil | View |
| 2023-11-06-15 | 11/06/2023 | 11/06/2023 | Department Acceptance | Soil | View |
| 2023-10-27-47 | 10/27/2023 | 10/31/2023 | Department Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
