Project Details
This page displays current information for project DEA: 01366004.
Project Information
| Project Identifiers | Project ID: 215741 DEA: 01366004 EFIS: 0100000127 |
|---|---|
| DIST-CO-RTE-PM | 01-HUM-101-80.0/84.0 |
| Award Date | 12/29/2022 |
| Closeout Date | Not set |
| Work Description | Indianola Cutoff UC |
| Location Description | HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGE TO BAYSIDE CUTOFF |
| QA Service Level | 1 (Verified on 05/17/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| efren.banuelos@dot.ca.gov | Efren Banuelos | Resident Engineer | Caltrans RE DB |
| adlai.evans@dot.ca.gov | Adlai Evans | Structural Representative | Caltrans SR DB |
| peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 61-70 of 85 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-08-12-87 | 08/12/2024 | 08/23/2024 | Acceptance | Asphalt Binder | View |
| 2024-09-04-4 | 09/04/2024 | 09/09/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2024-05-06-1 | 05/06/2024 | 05/06/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2024-04-24-7 | 04/24/2024 | 04/24/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2024-04-16-2 | 04/16/2024 | 04/19/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2024-04-09-3 | 04/09/2024 | 04/10/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2024-04-04-1 | 04/04/2024 | 04/10/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2024-04-02-4 | 04/02/2024 | 04/03/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2024-02-27-2 | 02/27/2024 | 02/29/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2024-02-21-3 | 02/21/2024 | 02/22/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
