Project Details
This page displays current information for project DEA: 051N3504.
Project Information
| Project Identifiers | Project ID: 215710 DEA: 051N3504 EFIS: 0520000173 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-101-37.8/46.0, 37.0/46.0 |
| Award Date | 06/09/2021 |
| Closeout Date | 09/06/2022 |
| Work Description | Replace concrete pavement with precast concrete panels. |
| Location Description | Near Atascadero on US 101 from 0.1 mile south of Route 58/10 separation to Traffic Way. |
| QA Service Level | 1 (Verified on 07/06/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| drussu@mnsengineers.com | Dean Russu | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 61-70 of 74 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2021-11-19-34 | 11/19/2021 | 11/22/2021 | Quality Control | Concrete | View |
| 2021-11-17-36 | 11/17/2021 | 11/18/2021 | Quality Control | Concrete | View |
| 2021-11-17-35 | 11/17/2021 | 11/18/2021 | Quality Control | Concrete | View |
| 2021-11-15-58 | 11/15/2021 | 11/16/2021 | Quality Control | Concrete | View |
| 2021-11-15-57 | 11/15/2021 | 11/16/2021 | Quality Control | Concrete | View |
| 2021-11-12-48 | 11/12/2021 | 11/13/2021 | Quality Control | Concrete | View |
| 2021-11-12-47 | 11/12/2021 | 11/13/2021 | Quality Control | Concrete | View |
| 2021-11-10-59 | 11/10/2021 | 11/11/2021 | Quality Control | Concrete | View |
| 2021-11-10-58 | 11/10/2021 | 11/11/2021 | Quality Control | Concrete | View |
| 2021-11-08-54 | 11/08/2021 | 11/09/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
