Project Details

This page displays current information for project DEA: 081K6904.

Project Information

Project IdentifiersProject ID: 1000607
DEA: 081K6904
EFIS: 0819000090
DIST-CO-RTE-PM08-RIV-74-5.7/11.8
Award Date01/09/2025
Closeout DateNot set
Work DescriptionROCK EXCAVATION, HMA (TYPE A), RHMA-G, AND CABLE NET DRAPERY SYSTEM.
Location DescriptionRIVERSIDE COUNTY IN AND NEAR LAKE ELSINORE FROM MONTE VISTA STREET TO GRAND AVENUE
QA Service Level1 (Verified on 01/13/2025)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
Fereydoon.Alipanah@dot.ca.govFereydoon AlipanahResident EngineerCaltrans RE DB
gizachew.abayneh@dot.ca.govGizachew AbaynehStructural RepresentativeCaltrans SR DB
jacob.bailey@dot.ca.govJacob BaileyMETS REPCaltrans METS REP DB
prakash.gowda@dot.ca.govPrakash GowdaDistrict Materials Engineer - Field Lab FontanaCaltrans District Materials Engineer
zihui.li@dot.ca.govZihui LiDistrict Materials Engineer - SRL PCC/Agg/Soils LabCaltrans District Materials Engineer
cristina.paredes@dot.ca.govCristina ParedesDistrict Materials Engineer - SRL HMA and Binder LabsCaltrans District Materials Engineer
sittampalam.sathiskumar@dot.ca.govSittampalam SathiskumarDistrict Materials Engineer - DesignCaltrans District Materials Engineer
kaushalkumar.talati@dot.ca.govKaushalkumar TalatiDistrict Materials Engineer - Field Lab Barstow and HesperiaCaltrans District Materials Engineer
brian.teh@dot.ca.govBrian TehDistrict Materials Engineer - SRL STS and Field Lab BlytheCaltrans District Materials Engineer

Samples

Samples submitted for this project.

Displaying 61-70 of 217 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2026-05-30-1605/30/202606/08/2026AcceptanceHot Mix AsphaltView
2026-05-17-2405/17/202605/22/2026AcceptanceHot Mix AsphaltView
2026-05-16-1805/16/202605/22/2026AcceptanceHot Mix AsphaltView
2026-06-27-1706/27/202606/30/2026Quality AssuranceHot Mix AsphaltView
2026-06-28-1706/28/202606/30/2026AcceptanceHot Mix AsphaltView
2026-06-27-1306/27/202606/30/2026AcceptanceHot Mix AsphaltView
2026-05-30-1505/30/202605/30/2026AcceptanceSoilView
2026-05-30-1405/30/202605/30/2026AcceptanceSoilView
2026-06-25-2706/25/202607/02/2026Quality AssuranceSMTL TM5 - Threaded BarView
2026-06-25-2506/25/202607/02/2026Quality AssuranceSMTL TM5 - Threaded BarView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
081K69042026-01-07-4501/07/2026View
081K69042025-12-30-2512/30/2025View

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods