Project Details
This page displays current information for project DEA: 053307C4.
Project Information
| Project Identifiers | Project ID: 994443 DEA: 053307C4 EFIS: 0514000028 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-41,46-44.5/45.3,54.0/57.8 |
| Award Date | 02/27/2023 |
| Closeout Date | Not set |
| Work Description | Wye Segment - Route 41/46 Separation |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 12/16/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| brian.harrington@dot.ca.gov | Brian Harrington | Resident Engineer | Caltrans RE DB |
| david.lewis@dot.ca.gov | Dave Lewis | Structural Representative | Caltrans SR DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 591-600 of 951 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-10-17-82 | 10/17/2024 | 10/18/2024 | Quality Control | Concrete | View |
| 2024-10-17-81 | 10/17/2024 | 10/18/2024 | Quality Control | Concrete | View |
| 2024-10-17-80 | 10/17/2024 | 10/18/2024 | Quality Control | Concrete | View |
| 2024-11-14-43 | 11/14/2024 | 11/14/2024 | Quality Control | Aggregate | View |
| 2024-10-15-76 | 10/15/2024 | 10/16/2024 | Quality Control | Concrete | View |
| 2024-10-10-83 | 10/10/2024 | 10/11/2024 | Quality Control | Concrete | View |
| 2024-11-07-48 | 11/07/2024 | 11/07/2024 | Quality Control | Aggregate | View |
| 2024-11-06-51 | 11/06/2024 | 11/06/2024 | Quality Control | Aggregate | View |
| 2024-10-09-106 | 10/09/2024 | 10/10/2024 | Quality Control | Concrete | View |
| 2024-10-09-105 | 10/09/2024 | 10/10/2024 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
