Project Details
This page displays current information for project DEA: 033H6104.
Project Information
| Project Identifiers | Project ID: 995202 DEA: 033H6104 EFIS: 0318000019 |
|---|---|
| DIST-CO-RTE-PM | 03-PLA-80-42.7/49.3 |
| Award Date | 02/15/2024 |
| Closeout Date | Not set |
| Work Description | RDWY EXC, HMA, JPCP, ALT PIPELINER, STEEL SOLDIER PILE, MOD LTG SYSTEM |
| Location Description | PLACER COUNTY ABOUT 9.4 MILES NORTH OF COLFAX FROM 0.5 MILE WEST OF MONTE VISTA OVERCROSSING TO 0.3 MILE EAST OF DRUM FOREBAY OVERCROSSING |
| QA Service Level | 1 (Verified on 11/13/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| tad.sampson@dot.ca.gov | Tad Sampson | Resident Engineer | Caltrans RE DB |
| jimmer.ross@dot.ca.gov | Jimmer Ross | Structural Representative | Caltrans SR DB |
| farzan.kazemi@dot.ca.gov | Farzan Kazemi | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 85 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-06-02-27 | 06/02/2024 | 06/06/2024 | Quality Control | Aggregate | View |
| 2024-07-26-14 | 07/26/2024 | 07/26/2024 | Quality Control | Concrete | View |
| 2024-07-25-19 | 07/25/2024 | 07/25/2024 | Quality Control | Concrete | View |
| 2024-07-24-26 | 07/24/2024 | 07/25/2024 | Quality Control | Concrete | View |
| 2024-07-23-52 | 07/23/2024 | 07/24/2024 | Quality Control | Concrete | View |
| 2024-07-22-41 | 07/22/2024 | 07/23/2024 | Quality Control | Concrete | View |
| 2024-07-19-37 | 07/19/2024 | 07/20/2024 | Quality Control | Concrete | View |
| 2024-07-18-56 | 07/18/2024 | 07/19/2024 | Quality Control | Concrete | View |
| 2024-07-08-75 | 07/08/2024 | 07/08/2024 | Quality Control | Concrete | View |
| 2024-07-05-5 | 07/05/2024 | 07/05/2024 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
