Project Details

This page displays current information for project DEA: 061G1104.

Project Information

Project IdentifiersProject ID: 995146
DEA: 061G1104
EFIS: 0623000147
DIST-CO-RTE-PM06-KIN-43-10.2/18.2
Award DateNot set
Closeout Date05/16/2024
Work DescriptionModifying signal and lighting systems.
Location DescriptionIn Kings County near Hanford from 0.2 mile south of Kansas Avenue to route 43/198 separation.
QA Service Level1 (Verified on 09/13/2023)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
ryan.wilson@nv5.comRyan WilsonResident EngineerCaltrans RE DB

Samples

Samples submitted for this project.

Displaying 51-52 of 52 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2023-09-11-1509/11/202309/11/2023Quality AssuranceHot Mix AsphaltView
2023-09-11-1409/11/202309/11/2023Quality AssuranceAggregateView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

82.7%17.3%CT D06 - Millbrook Field Laboratory (82.7%)CT HQ - Sacramento Asphalt Binder Laboratory (17.3%)

Sample Types

96.2%Department Acceptance (1.9%)Quality Assurance (96.2%)Verification (1.9%)

Number of Tests

87.5%12.5%CT D06 - Millbrook Field Laboratory (87.5%)CT HQ - Sacramento Asphalt Binder Laboratory (12.5%)

Test Types

97.2%Department Acceptance (1.4%)Quality Assurance (97.2%)Verification (1.4%)

Material Types

40.4%17.3%42.3%Aggregate (40.4%)Asphaltic Emulsion (17.3%)Hot Mix Asphalt (42.3%)

Test Methods

27.8%29.2%30.6%AASHTO T 176 (27.8%)AASHTO T 27 (29.2%)AASHTO T 308 (30.6%)AASHTO T 59 (5.6%)AASHTO T 59 (6.9%)