Project Details
This page displays current information for project DEA: 034H0704.
Project Information
| Project Identifiers | Project ID: 994975 DEA: 034H0704 EFIS: 0318000158 |
|---|---|
| DIST-CO-RTE-PM | 03-NEV-20-R12.2/20.0 |
| Award Date | 10/26/2023 |
| Closeout Date | 07/15/2025 |
| Work Description | COLD PLANE AND OVERLAY, INSTALL CURED-IN-PLACE PIPELINERS. |
| Location Description | NEVADA COUNTY IN AND NEAR GRASS VALLEY AND NEVADA CITY FROM ROUTE 20/49 SEPARATION TO 0.1 MILE EAST OF CELIO ROAD |
| QA Service Level | 1 (Verified on 08/28/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| renee.plaza@dot.ca.gov | Renee Plaza | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 149 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-07-28-24 | 07/28/2024 | 08/12/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-07-30-92 | 07/30/2024 | 08/12/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-07-28-5 | 07/28/2024 | 07/31/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-07-30-23 | 07/30/2024 | 07/31/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-07-29-17 | 07/29/2024 | 07/31/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-07-23-83 | 07/23/2024 | 07/31/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-07-24-47 | 07/24/2024 | 07/31/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-07-25-40 | 07/25/2024 | 07/31/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-07-17-83 | 07/17/2024 | 07/26/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-07-16-91 | 07/16/2024 | 07/26/2024 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
