Project Details
This page displays current information for project DEA: 07357304.
Project Information
| Project Identifiers | Project ID: 994962 DEA: 07357304 EFIS: 0719000062 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-6.6/13.1 |
| Award Date | 04/27/2023 |
| Closeout Date | Not set |
| Work Description | REPLACE CONCRETE SLABS AND MEDIAN BARRIER, |
| Location Description | LOS ANGELES COUNTY IN SANTA FE SPRINGS, DOWNEY AND CITY OF COMMERCE FROM 0.2 MILE SOUTH OF ROUTE 5/605 SEPARATION TO 0.1 MILE NORT |
| QA Service Level | 1 (Verified on 07/13/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| martin.oregel@dot.ca.gov | Martin Oregel | Resident Engineer | Caltrans RE DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 114 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-07-23-30 | 07/23/2025 | 07/25/2025 | Verification | Aggregate | View |
| 2025-07-22-35 | 07/22/2025 | 07/24/2025 | Verification | Crumb Rubber Modifier | View |
| 2025-07-22-33 | 07/22/2025 | 07/24/2025 | Verification | Crumb Rubber Modifier | View |
| 2025-07-22-26 | 07/22/2025 | 07/24/2025 | Verification | Aggregate | View |
| 2025-06-27-36 | 06/27/2025 | 06/30/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-06-25-68 | 06/25/2025 | 06/30/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-06-23-48 | 06/23/2025 | 06/27/2025 | Verification | Asphalt Binder | View |
| 2025-06-27-34 | 06/27/2025 | 06/30/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-06-26-75 | 06/26/2025 | 06/30/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-06-26-73 | 06/26/2025 | 06/27/2025 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
