Project Details
This page displays current information for project DEA: 07313504.
Project Information
| Project Identifiers | Project ID: 994654 DEA: 07313504 EFIS: 0715000090 |
|---|---|
| DIST-CO-RTE-PM | 07-LA,VEN-1-37.7/62.9,0.0/0.9 |
| Award Date | 07/20/2023 |
| Closeout Date | Not set |
| Work Description | REMOVE AND CONSTRUCT BRIDGE AND CULVERTS. |
| Location Description | LOS ANGELES AND VENTURA COUNTIES AT VARIOUS LOCATIONS FROM 0.4 MILE SOUTH OF TEMESCAL CANYON ROAD TO 0.1 MILE NORTH OF TONGA STREET |
| QA Service Level | 1 (Verified on 07/24/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| dan.leon@dot.ca.gov | Dan Leon | Resident Engineer | Caltrans RE DB |
| aziz.maghsoudloo@bureauveritas.com | Aziz Maghsoudloo | Structural Representative | Caltrans SR DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 147 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-06-27-140 | 06/27/2024 | 06/28/2024 | Quality Control | Concrete | View |
| 2024-06-27-139 | 06/27/2024 | 06/27/2024 | Quality Control | Aggregate | View |
| 2024-06-26-167 | 06/26/2024 | 06/26/2024 | Quality Control | Aggregate | View |
| 2024-06-26-166 | 06/26/2024 | 06/27/2024 | Quality Control | Concrete | View |
| 2024-06-25-156 | 06/25/2024 | 06/26/2024 | Quality Control | Concrete | View |
| 2024-06-25-155 | 06/25/2024 | 06/25/2024 | Quality Control | Aggregate | View |
| 2024-06-24-164 | 06/24/2024 | 06/24/2024 | Quality Control | Aggregate | View |
| 2024-06-24-163 | 06/24/2024 | 06/25/2024 | Quality Control | Concrete | View |
| 2024-06-21-111 | 06/21/2024 | 06/22/2024 | Quality Control | Concrete | View |
| 2024-06-21-110 | 06/21/2024 | 06/21/2024 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
