Project Details
This page displays current information for project DEA: 053307C4.
Project Information
| Project Identifiers | Project ID: 994443 DEA: 053307C4 EFIS: 0514000028 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-41,46-44.5/45.3,54.0/57.8 |
| Award Date | 02/27/2023 |
| Closeout Date | Not set |
| Work Description | Wye Segment - Route 41/46 Separation |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 12/16/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| brian.harrington@dot.ca.gov | Brian Harrington | Resident Engineer | Caltrans RE DB |
| david.lewis@dot.ca.gov | Dave Lewis | Structural Representative | Caltrans SR DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 951 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-09-16-89 | 09/16/2025 | 09/17/2025 | Acceptance | Concrete | View |
| 2025-09-16-88 | 09/16/2025 | 09/17/2025 | Acceptance | Concrete | View |
| 2025-09-16-87 | 09/16/2025 | 09/17/2025 | Acceptance | Concrete | View |
| 2025-09-12-56 | 09/12/2025 | 09/13/2025 | Acceptance | Concrete | View |
| 2025-09-12-55 | 09/12/2025 | 09/13/2025 | Acceptance | Concrete | View |
| 2025-10-13-4 | 10/13/2025 | 10/13/2025 | Acceptance | Aggregate | View |
| 2025-10-10-18 | 10/10/2025 | 10/10/2025 | Acceptance | Aggregate | View |
| 2025-10-09-32 | 10/09/2025 | 10/09/2025 | Acceptance | Aggregate | View |
| 2025-10-07-29 | 10/07/2025 | 10/07/2025 | Acceptance | Aggregate | View |
| 2025-10-06-19 | 10/06/2025 | 10/06/2025 | Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
