Project Details
This page displays current information for project DEA: 081G4704.
Project Information
| Project Identifiers | Project ID: 994327 DEA: 081G4704 EFIS: 0816000001 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74-3.1/53.5 |
| Award Date | 01/02/2023 |
| Closeout Date | Not set |
| Work Description | STRUCTURAL CONC BR, CONC SLAB, HMA (TYPE A), ALT CRASH CUSHION SYSTEM. |
| Location Description | RIVERSIDE COUNTY NEAR LAKE ELSINORE AT MORRILL CANYON BRIDGE AND NEAR HEMET AT STRAWBERRY CREEK BRIDGE. |
| QA Service Level | 1 (Verified on 06/08/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mike.bergevin@dot.ca.gov | Mike A Bergevin | Resident Engineer | Caltrans RE DB |
| arnel.vega@dot.ca.gov | Arnel Vega | Structural Representative | Caltrans SR DB |
| james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 101 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-02-13-57 | 02/13/2024 | 02/13/2024 | Quality Control | Concrete | View |
| 2024-02-13-56 | 02/13/2024 | 02/13/2024 | Quality Control | Concrete | View |
| 2024-02-13-55 | 02/13/2024 | 02/13/2024 | Quality Control | Concrete | View |
| 2024-02-13-54 | 02/13/2024 | 02/13/2024 | Quality Control | Concrete | View |
| 2024-02-13-53 | 02/13/2024 | 02/13/2024 | Quality Control | Concrete | View |
| 2024-02-13-52 | 02/13/2024 | 02/13/2024 | Quality Control | Concrete | View |
| 2024-02-01-14 | 02/01/2024 | 02/01/2024 | Quality Control | Concrete | View |
| 2024-02-01-13 | 02/01/2024 | 02/01/2024 | Quality Control | Concrete | View |
| 2024-02-01-12 | 02/01/2024 | 02/01/2024 | Quality Control | Concrete | View |
| 2024-02-01-11 | 02/01/2024 | 02/01/2024 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
