Project Details
This page displays current information for project DEA: 051C3604.
Project Information
Project Identifiers | Project ID: 994326 DEA: 051C3604 EFIS: 0512000134 |
---|---|
DIST-CO-RTE-PM | 05-SB-217-0.9/1.4 |
Award Date | 01/31/2023 |
Closeout Date | Not set |
Work Description | REPLACE BRIDGE. |
Location Description | SANTA BARBARA COUNTY NEAR GOLETA FROM 0.2 MILE EAST OF GOLETA SLOUGH BRIDGE TO 0.4 MILE EAST OF SAN JOSE CREEK BRIDGE |
QA Service Level | 1 (Verified on 10/17/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
manny.yogarajah@dot.ca.gov | Manny Yogarajah | Resident Engineer | Caltrans RE DB |
alis.chhay@dot.ca.gov | Alis Chhay | Structural Representative | Caltrans SR DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 103 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-08-28-2 | 08/28/2023 | 09/15/2023 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
2023-08-28-3 | 08/28/2023 | 09/15/2023 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
2023-08-28-4 | 08/28/2023 | 09/15/2023 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
2023-08-28-5 | 08/28/2023 | 09/05/2023 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
2023-08-28-6 | 08/28/2023 | 09/05/2023 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
2023-08-28-7 | 08/28/2023 | 09/05/2023 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
2023-08-28-8 | 08/28/2023 | 09/05/2023 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
2023-08-28-9 | 08/28/2023 | 09/05/2023 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
2023-08-18-12 | 08/18/2023 | 08/25/2023 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2023-08-18-14 | 08/18/2023 | 08/23/2023 | Quality Control | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods