Project Details
This page displays current information for project DEA: 11430514.
Project Information
| Project Identifiers | Project ID: 993529 DEA: 11430514 EFIS: 1119000008 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-15-R31.3/R37.1 |
| Award Date | 05/27/2022 |
| Closeout Date | Not set |
| Work Description | CRCP, FIBER OPTIC CABLE, AND HMA. |
| Location Description | SAN DIEGO COUNTY IN AND NEAR ESCONDIDO FROM 0.2 MILE SOUTH OF ROUTE 15/78 SEPARATION TO 0.5 MILE NORTH OF DEER SPRINGS ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 02/07/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Jason.Alsheikh@dot.ca.gov | Jason Alsheikh | Resident Engineer | Caltrans RE DB |
| tan.cao@dot.ca.gov | Tan Cao | Structural Representative | Caltrans SR DB |
| julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 87 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-09-23-37 | 09/23/2024 | 09/23/2024 | Quality Assurance | Aggregate | View |
| 2024-09-12-57 | 09/12/2024 | 09/18/2024 | Quality Assurance | Concrete | View |
| 2024-09-04-89 | 09/04/2024 | 09/16/2024 | Quality Assurance | Aggregate | View |
| 2024-09-04-88 | 09/04/2024 | 09/16/2024 | Quality Assurance | Aggregate | View |
| 2024-09-03-55 | 09/03/2024 | 09/16/2024 | Quality Assurance | Aggregate | View |
| 2024-09-04-87 | 09/04/2024 | 09/16/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-09-04-86 | 09/04/2024 | 09/16/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-09-03-54 | 09/03/2024 | 09/16/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-09-05-74 | 09/05/2024 | 09/09/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-09-03-28 | 09/03/2024 | 09/04/2024 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
