Project Details
This page displays current information for project DEA: 051N3504.
Project Information
| Project Identifiers | Project ID: 215710 DEA: 051N3504 EFIS: 0520000173 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-101-37.8/46.0, 37.0/46.0 |
| Award Date | 06/09/2021 |
| Closeout Date | 09/06/2022 |
| Work Description | Replace concrete pavement with precast concrete panels. |
| Location Description | Near Atascadero on US 101 from 0.1 mile south of Route 58/10 separation to Traffic Way. |
| QA Service Level | 1 (Verified on 07/06/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| drussu@mnsengineers.com | Dean Russu | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 74 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2021-12-07-21 | 12/07/2021 | 12/08/2021 | Quality Control | Concrete | View |
| 2021-12-06-66 | 12/06/2021 | 12/07/2021 | Quality Control | Concrete | View |
| 2021-12-06-65 | 12/06/2021 | 12/07/2021 | Quality Control | Concrete | View |
| 2021-12-03-64 | 12/03/2021 | 12/04/2021 | Quality Control | Concrete | View |
| 2021-12-03-63 | 12/03/2021 | 12/04/2021 | Quality Control | Concrete | View |
| 2021-11-30-57 | 11/30/2021 | 12/01/2021 | Quality Control | Concrete | View |
| 2021-11-30-56 | 11/30/2021 | 12/01/2021 | Quality Control | Concrete | View |
| 2021-11-23-44 | 11/23/2021 | 11/23/2021 | Quality Control | Concrete | View |
| 2021-11-23-43 | 11/23/2021 | 11/24/2021 | Quality Control | Concrete | View |
| 2021-11-19-35 | 11/19/2021 | 11/22/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
