Project Details
This page displays current information for project DEA: 051G9804.
Project Information
| Project Identifiers | Project ID: 215336 DEA: 051G9804 EFIS: 0516000009 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-1-10.0/16.8 |
| Award Date | 12/19/2022 |
| Closeout Date | Not set |
| Work Description | RHMA (GAP GRADED), RETAINING WALL, CURB RAMPS AND LIGHTING SYSTEMS. |
| Location Description | SAN LUIS OBISPO COUNTY FROM GRACIA WAY AT OCEANO TO ROUTE 1/101 SEPARATION IN PISMO BEACH. |
| QA Service Level | 1 (Verified on 11/18/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| al.reed@dot.ca.gov | ALBERT REED | Resident Engineer | Caltrans RE DB |
| sal.heredia@dot.ca.gov | Sal Heredia | Structural Representative | Caltrans SR DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 81 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-09-27-94 | 09/27/2023 | 09/27/2023 | Quality Assurance | Aggregate | View |
| 2023-09-27-93 | 09/27/2023 | 09/27/2023 | Quality Assurance | Aggregate | View |
| 2023-09-26-85 | 09/26/2023 | 09/26/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-09-24-30 | 09/24/2023 | 09/24/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-09-24-29 | 09/24/2023 | 09/24/2023 | Quality Assurance | Aggregate | View |
| 2023-09-19-67 | 09/19/2023 | 09/19/2023 | Quality Assurance | Aggregate | View |
| 2023-09-19-66 | 09/19/2023 | 09/19/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-09-17-10 | 09/17/2023 | 09/17/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-09-17-9 | 09/17/2023 | 09/17/2023 | Quality Assurance | Aggregate | View |
| 2023-10-16-21 | 10/16/2023 | 10/16/2023 | Department Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
