Project Details
This page displays current information for project DEA: 030F2844.
Project Information
| Project Identifiers | Project ID: 214701 DEA: 030F2844 EFIS: 0319000204 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-99-7.1/9.4 |
| Award Date | 05/14/2020 |
| Closeout Date | 11/27/2023 |
| Work Description | Construct new PCC precast girder bridge over UPRR at McConnell OH between existing SB and NB alignments |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 04/20/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Masoud.Saed@dot.ca.gov | Masoud Saed | Resident Engineer | Caltrans RE DB |
| chau.ha@dot.ca.gov | Chau Ha | Structural Representative | Caltrans SR DB |
| mihai.hantelmann@dot.ca.gov | Mihai Hantelmann | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 87 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2020-08-14-17 | 08/14/2020 | 08/17/2020 | Quality Assurance | Concrete | View |
| 2020-08-14-16 | 08/14/2020 | 08/17/2020 | Quality Assurance | Concrete | View |
| 2020-08-14-15 | 08/14/2020 | 08/17/2020 | Quality Assurance | Concrete | View |
| 2020-08-10-20 | 08/10/2020 | 08/12/2020 | Quality Assurance | Concrete | View |
| 2020-08-10-19 | 08/10/2020 | 08/12/2020 | Quality Assurance | Concrete | View |
| 2020-08-10-18 | 08/10/2020 | 08/12/2020 | Quality Assurance | Concrete | View |
| 2020-08-05-15 | 08/05/2020 | 08/11/2020 | Quality Assurance | SMTL TM6 - Ductile Iron Cast Samples | View |
| 2020-08-06-30 | 08/06/2020 | 08/11/2020 | Quality Assurance | Concrete | View |
| 2020-08-06-29 | 08/06/2020 | 08/11/2020 | Quality Assurance | Concrete | View |
| 2020-08-06-24 | 08/06/2020 | 08/11/2020 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
