Project Details
This page displays current information for project DEA: 043G9004.
Project Information
| Project Identifiers | Project ID: 209109 DEA: 043G9004 EFIS: 0412000557 COOP: 042513 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-116,121-46.0/46.7,5.8/R7.4 |
| Award Date | 07/31/2023 |
| Closeout Date | Not set |
| Work Description | MODIFY EXISTING STATE ROUTE 116,121 BONNEAU ROAD INTERSECTION FROM A 4 WAY STOP CONTROLLED INTERSECTION TO A ROUNDABOUT AND SIGNALIZED INTERSECTION. |
| Location Description | SONOMA COUNTY |
| QA Service Level | 1 (Verified on 08/15/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| fabio.laserna@dot.ca.gov | Fabio La Serna | Resident Engineer | Caltrans RE DB |
| waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 101 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-10-04-105 | 10/04/2024 | 10/04/2024 | Quality Assurance | Soil | View |
| 2024-10-04-104 | 10/04/2024 | 10/04/2024 | Quality Assurance | Soil | View |
| 2024-09-30-104 | 09/30/2024 | 09/30/2024 | Quality Assurance | Soil | View |
| 2024-09-30-103 | 09/30/2024 | 09/30/2024 | Quality Assurance | Soil | View |
| 2024-09-26-128 | 09/26/2024 | 09/26/2024 | Quality Assurance | Soil | View |
| 2024-09-23-113 | 09/23/2024 | 09/23/2024 | Quality Assurance | Soil | View |
| 2024-12-10-52 | 12/10/2024 | 12/10/2024 | Acceptance | Aggregate | View |
| 2024-08-06-142 | 08/06/2024 | 08/06/2024 | Quality Assurance | Soil | View |
| 2024-08-02-96 | 08/02/2024 | 08/02/2024 | Quality Assurance | Aggregate | View |
| 2024-10-28-62 | 10/28/2024 | 10/29/2024 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
