Project Details
This page displays current information for project DEA: 100V4804.
Project Information
| Project Identifiers | Project ID: 1000272 DEA: 100V4804 EFIS: 1013000264 |
|---|---|
| DIST-CO-RTE-PM | 10-CAL-26-21.8/30.3 |
| Award Date | 09/09/2024 |
| Closeout Date | Not set |
| Work Description | SLOPE STABILIZATION AND CONSTRUCT RETAINING WALL. |
| Location Description | CALAVERAS COUNTY NEAR MOKELUMNE HILL AT VARIOUS LOCATIONS FROM 3.6 MILES EAST OF ROUTE 49 TO 0.9 MILE WEST OF WOODHOUSE MINE ROAD |
| QA Service Level | 1 (Verified on 04/15/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jonathan.ngai@dot.ca.gov | Jonathan Ngai | Resident Engineer | Caltrans RE DB |
| Conor.Hennessy@dot.ca.gov | Conor Hennessy | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 138 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-08-11-10 | 08/11/2025 | 08/11/2025 | Quality Control | Concrete | View |
| 2025-08-08-10 | 08/08/2025 | 08/08/2025 | Quality Control | Concrete | View |
| 2025-08-05-19 | 08/05/2025 | 08/05/2025 | Quality Control | Concrete | View |
| 2025-08-04-14 | 08/04/2025 | 08/04/2025 | Quality Control | Concrete | View |
| 2025-07-21-24 | 07/21/2025 | 07/25/2025 | Quality Assurance | Concrete | View |
| 2025-07-15-16 | 07/15/2025 | 07/15/2025 | Quality Control | Concrete | View |
| 2025-07-14-25 | 07/14/2025 | 07/14/2025 | Quality Control | Concrete | View |
| 2025-07-08-4 | 07/08/2025 | 07/08/2025 | Quality Control | Concrete | View |
| 2025-07-07-12 | 07/07/2025 | 07/07/2025 | Quality Control | Concrete | View |
| 2025-07-03-10 | 07/03/2025 | 07/03/2025 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
