Project Details
This page displays current information for project DEA: 070W4504.
Project Information
| Project Identifiers | Project ID: 1000253 DEA: 070W4504 EFIS: 0722000060 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-138-50.0/63.7 |
| Award Date | 06/13/2024 |
| Closeout Date | 05/07/2025 |
| Work Description | PLACE HMA (TYPE A) AND COLD PLANE ASPHALT CONCRETE PAVEMENT. |
| Location Description | LOS ANGELES COUNTY IN AND NEAR PALMDALE FROM 0.1 MILE SOUTH OF AVENUE S TO 0.1 MILE EAST OF 165TH STREET EAST |
| QA Service Level | 1 (Verified on 09/16/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| ramy.beshara@dot.ca.gov | Ramy Beshara | Resident Engineer | Caltrans RE DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 74 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-09-13-64 | 09/13/2024 | 09/16/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-14-15 | 09/14/2024 | 09/16/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-14-14 | 09/14/2024 | 09/19/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-14-13 | 09/14/2024 | 09/19/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-16-82 | 09/16/2024 | 09/16/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-16-81 | 09/16/2024 | 09/25/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-17-101 | 09/17/2024 | 09/19/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-19-77 | 09/19/2024 | 10/01/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-19-76 | 09/19/2024 | 10/01/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-19-75 | 09/19/2024 | 10/01/2024 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
