Project Details

This page displays current information for project DEA: 080C2514.

Project Information

Project IdentifiersProject ID: 212112
DEA: 080C2514
EFIS: 0816000076
COOP: 081645
DIST-CO-RTE-PM08-SBD-10-0.0/13.2
Award Date06/06/2018
Closeout DateNot set
Work DescriptionDesign-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes
Location DescriptionLA/SBD County Line to PM 13.2 near I-15
QA Service Level1 (Verified on 10/16/2019)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
jcorona@syrusaengineering.comJose CoronaResident EngineerCaltrans RE DB
michael.cattabiani@dot.ca.govMichael CattabianiMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 521-530 of 1072 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2022-09-22-3409/22/202209/23/2022Quality AssuranceAggregateView
2022-09-23-3109/23/202209/23/2022Quality AssuranceSoilView
2022-09-23-3009/23/202209/26/2022Quality AssuranceConcreteView
2022-09-22-3209/22/202209/23/2022Quality AssuranceConcreteView
2022-09-17-709/17/202209/17/2022Quality AssuranceAggregateView
2022-09-16-3309/16/202209/19/2022Quality AssuranceAggregateView
2022-09-14-6709/14/202209/15/2022Quality AssuranceAggregateView
2022-09-12-3709/12/202209/12/2022Quality AssuranceAggregateView
2022-09-20-1809/20/202209/20/2022Quality AssuranceSoilView
2022-09-17-509/17/202209/19/2022Quality AssuranceConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

39.7%35.6%Con-Fab California Corporation - Lathrop (5.3%)Con-Fab California, LLC (1.2%)CT - Unassigned/General Field Laboratory (0.7%)CT D08 - Barstow Field Laboratory 1 (39.7%)CT D08 - Blythe Field Testing Laboratory (2.6%)CT D08 - Fontana Field Testing Laboratory (0.6%)CT D08 - Fontana Southern Regional Laboratory (35.6%)CT D08 - Hesperia Field Testing Laboratory (0.1%)CT HQ - QASI Bay Area Field Office (0.3%)CT HQ - QASI Los Angeles Field Office (6.5%)

Sample Types

14.9%64.7%9.4%Annual Source Testing (0.1%)Department Acceptance (14.9%)Dispute Resolution (0.2%)Independent Assurance (0.1%)Per Request (5.2%)Preliminary (0.1%)Production Start-Up (0.8%)Quality Assurance (64.7%)Quality Control (9.4%)Verification (4.4%)

Number of Tests

25.6%37.6%26.7%Con-Fab California Corporation - Lathrop (6.8%)Con-Fab California, LLC (0.5%)CT D08 - Barstow Field Laboratory 1 (25.6%)CT D08 - Blythe Field Testing Laboratory (1.4%)CT D08 - Fontana Field Testing Laboratory (0.5%)CT D08 - Fontana Southern Regional Laboratory (37.6%)CT D08 - Hesperia Field Testing Laboratory (0%)CT HQ - Sacramento Chemistry Laboratory (0.4%)CT HQ - Sacramento Concrete Testing Laboratory (0.5%)CT HQ - Sacramento Structural Materials Testing Laboratory (26.7%)

Test Types

9.2%59.5%8.9%13.4%Department Acceptance (6.8%)Dispute Resolution (0.1%)Independent Assurance (0.2%)Per Request (9.2%)Preliminary (0.1%)Production Start-Up (2%)Quality Assurance (59.5%)Quality Control (8.9%)Verification (13.4%)

Material Types

10.4%23.4%34%Aggregate (10.4%)Asphalt Binder (2%)Concrete (23.4%)Hot Mix Asphalt (34%)Polyester (0.2%)SMTL TM1 - Elastomeric Bearing Pad (0.9%)SMTL TM3 - Fastener Assembly (1.6%)SMTL TM4 - Prestressing Strand (0.4%)SMTL TM5 - Couplers (4.3%)SMTL TM5 - Headed Bars (1.9%)

Test Methods

ASTM C 39 (5.7%)AASHTO T 96 (1.1%)AASHTO T 304 (1.1%)CTM 202 (2.1%)AASHTO T 84 (1.1%)AASHTO T 85 (1.1%)AASHTO T 176 (1.1%)AASHTO T 315 (1%)ASTM C 293 (3%)CTM 523 (0.1%)