Project Details
This page displays current information for project DEA: 080Q75U4.
Project Information
| Project Identifiers | Project ID: 213746 DEA: 080Q75U4 EFIS: 0817000114 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD,RIV-60-R4.6/R9.9, R0.0/12.2 |
| Award Date | 04/18/2019 |
| Closeout Date | 06/28/2022 |
| Work Description | REPLACEMENT OF TWO OUTSIDE LANES AND CONCRETE SLABS |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 06/17/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mujahid.qureshi@dot.ca.gov | Mujahid Qureshi | Resident Engineer | Caltrans RE DB |
| ching.chuang@dot.ca.gov | Ching Chuang | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 501-510 of 966 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2020-05-02-9 | 05/02/2020 | 06/05/2020 | Quality Assurance | Concrete | View |
| 2020-05-02-8 | 05/02/2020 | 06/05/2020 | Quality Assurance | Concrete | View |
| 2020-05-02-7 | 05/02/2020 | 06/05/2020 | Quality Assurance | Concrete | View |
| 2020-05-30-3 | 05/30/2020 | 05/20/2020 | Quality Assurance | Concrete | View |
| 2020-05-30-2 | 05/30/2020 | 05/20/2020 | Quality Assurance | Concrete | View |
| 2020-05-30-1 | 05/30/2020 | 05/20/2020 | Quality Assurance | Concrete | View |
| 2020-05-19-15 | 05/19/2020 | 05/26/2020 | Verification | Aggregate | View |
| 2020-05-03-5 | 05/03/2020 | 05/04/2020 | Department Acceptance | Concrete | View |
| 2020-05-03-4 | 05/03/2020 | 05/04/2020 | Department Acceptance | Concrete | View |
| 2020-05-03-3 | 05/03/2020 | 05/04/2020 | Department Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
