Project Details
This page displays current information for project DEA: 073096U4.
Project Information
| Project Identifiers | Project ID: 214573 DEA: 073096U4 EFIS: 0719000091 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-210-R0.0/R9.7 |
| Award Date | 04/03/2020 |
| Closeout Date | 06/06/2024 |
| Work Description | PLACE CONCRETE PAVEMENT, BARRIER, HMA, DRAINAGE, AND ELECTRICAL. |
| Location Description | LOS ANGELES COUNTY IN LOS ANGELES FROM INTERSTATE 5 TO WHEATLAND AVENUE UNDERCROSSING |
| QA Service Level | 1 (Verified on 06/05/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| ridwan.salman@dot.ca.gov | Ridwan Salman | Resident Engineer | Caltrans RE DB |
| adriana.pimienta@dot.ca.gov | Adriana Pimienta | Structural Representative | Caltrans SR DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 491-500 of 753 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-02-10-58 | 02/10/2022 | 02/15/2022 | Quality Assurance | Aggregate | View |
| 2022-04-21-13 | 04/21/2022 | 04/22/2022 | Quality Assurance | Concrete | View |
| 2022-04-20-30 | 04/20/2022 | 04/21/2022 | Quality Assurance | Concrete | View |
| 2022-03-30-27 | 03/30/2022 | 03/30/2022 | Department Acceptance | Soil | View |
| 2022-03-30-26 | 03/30/2022 | 03/30/2022 | Department Acceptance | Soil | View |
| 2022-03-29-37 | 03/29/2022 | 03/29/2022 | Department Acceptance | Soil | View |
| 2022-03-29-36 | 03/29/2022 | 03/29/2022 | Department Acceptance | Soil | View |
| 2022-04-20-29 | 04/20/2022 | 04/20/2022 | Quality Assurance | Concrete | View |
| 2022-04-20-28 | 04/20/2022 | 04/21/2022 | Quality Assurance | Concrete | View |
| 2022-04-25-2 | 04/25/2022 | 04/25/2022 | Department Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
