Project Details
This page displays current information for project DEA: 07321604.
Project Information
| Project Identifiers | Project ID: 995057 DEA: 07321604 EFIS: 0716000049 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-1-0.0/18.0 |
| Award Date | 12/20/2023 |
| Closeout Date | Not set |
| Work Description | COLD PLANE AND OVERLAY AC PAVEMENT AND UPGRADE ADA CURB RAMPS. |
| Location Description | LOS ANGELES COUNTY FROM STUDEBAKER ROAD TO PASEO DE LAS DELICIAS |
| QA Service Level | 1 (Verified on 08/08/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| thang.ton@dot.ca.gov | Thang Ton | Resident Engineer | Caltrans RE DB |
| jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 216 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-06-02-117 | 06/02/2025 | 06/05/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-09-15-57 | 09/15/2025 | 09/22/2025 | Verification | Asphalt Rubber Binder | View |
| 2025-09-15-55 | 09/15/2025 | 09/22/2025 | Verification | Asphalt Binder | View |
| 2025-09-15-50 | 09/15/2025 | 09/22/2025 | Verification | Crumb Rubber Modifier | View |
| 2025-09-15-49 | 09/15/2025 | 09/22/2025 | Verification | Aggregate | View |
| 2025-09-15-47 | 09/15/2025 | 09/22/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2025-07-09-104 | 07/09/2025 | 07/10/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-07-08-87 | 07/08/2025 | 07/10/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-07-08-86 | 07/08/2025 | 07/10/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-07-07-75 | 07/07/2025 | 07/10/2025 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
