Project Details
This page displays current information for project DEA: 07333604.
Project Information
| Project Identifiers | Project ID: 994583 DEA: 07333604 EFIS: 0716000313 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-2-2.3/14.2 |
| Award Date | 11/26/2024 |
| Closeout Date | Not set |
| Work Description | COLD PLANE AC, PLACE HMA, REPLACE CURB RAMPS AND TRAFFIC SIGNALS. |
| Location Description | LOS ANGELES COUNTY IN LOS ANGELES AT VARIOUS LOCATIONS FROM CENTINELA AVENUE TO GLENDALE BOULEVARD UNDERCROSSING |
| QA Service Level | 1 (Verified on 07/24/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| denrick.bautista@dot.ca.gov | Denrick Bautista | Resident Engineer | Caltrans RE DB |
| gon.choi@dot.ca.gov | Gon Choi | Structural Representative | Caltrans SR DB |
| jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 62 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-11-07-18 | 11/07/2025 | 11/07/2025 | Acceptance | Soil | View |
| 2025-11-07-17 | 11/07/2025 | 11/07/2025 | Acceptance | Soil | View |
| 2025-11-05-26 | 11/05/2025 | 11/05/2025 | Acceptance | Soil | View |
| 2025-11-05-24 | 11/05/2025 | 11/05/2025 | Acceptance | Soil | View |
| 2025-11-03-23 | 11/03/2025 | 11/03/2025 | Quality Assurance | Soil | View |
| 2025-11-03-18 | 11/03/2025 | 11/03/2025 | Acceptance | Soil | View |
| 2025-11-03-17 | 11/03/2025 | 11/03/2025 | Acceptance | Soil | View |
| 2025-11-03-16 | 11/03/2025 | 11/03/2025 | Acceptance | Soil | View |
| 2025-10-29-35 | 10/29/2025 | 10/29/2025 | Quality Assurance | Soil | View |
| 2025-10-29-14 | 10/29/2025 | 10/29/2025 | Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
