Project Details
This page displays current information for project DEA: 051K0504.
Project Information
| Project Identifiers | Project ID: 993236 DEA: 051K0504 EFIS: 0518000114 |
|---|---|
| DIST-CO-RTE-PM | 05-MON-1-55.7/55.9 |
| Award Date | 10/14/2021 |
| Closeout Date | 09/02/2022 |
| Work Description | CONSTRUCT EARTH RETAINING SYSTEM WITH CIDH PILE & STRUCTURAL CONCRETE. |
| Location Description | MONTEREY COUNTY NEAR LITTLE SUR RIVER FROM 0.4 MILE SOUTH OF LITTLE SUR RIVER BRIDGE TO 0.2 MILE SOUTH OF LITTLE SUR RIVER BRIDGE |
| QA Service Level | 1 (Verified on 10/06/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| arashdeep.pannu@dot.ca.gov | Arashdeep (Art) Pannu | Resident Engineer | Caltrans RE DB |
| david.galarza@dot.ca.gov | David Galarza | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 65 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-02-15-22 | 02/15/2022 | 02/15/2022 | Quality Control | Aggregate | View |
| 2022-02-15-21 | 02/15/2022 | 02/15/2022 | Quality Control | Aggregate | View |
| 2022-03-15-6 | 03/15/2022 | 03/15/2022 | Quality Assurance | Aggregate | View |
| 2022-03-15-4 | 03/15/2022 | 03/17/2022 | Quality Assurance | Concrete | View |
| 2022-03-14-16 | 03/14/2022 | 03/14/2022 | Quality Assurance | Aggregate | View |
| 2022-02-14-42 | 02/14/2022 | 02/14/2022 | Quality Control | Concrete | View |
| 2022-02-14-41 | 02/14/2022 | 02/14/2022 | Quality Control | Aggregate | View |
| 2022-02-14-40 | 02/14/2022 | 02/14/2022 | Quality Control | Aggregate | View |
| 2022-02-11-35 | 02/11/2022 | 02/11/2022 | Quality Control | Concrete | View |
| 2022-02-11-34 | 02/11/2022 | 02/11/2022 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
