Project Details
This page displays current information for project DEA: 120H0474.
Project Information
| Project Identifiers | Project ID: 993153 DEA: 120H0474 EFIS: 1212000053 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-241-27.8/38.0 |
| Award Date | 10/21/2021 |
| Closeout Date | 06/18/2025 |
| Work Description | PLACE HMA AND PERFORATED PLASTIC PIPE UNDERDRAIN. |
| Location Description | ORANGE COUNTY AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF ROUTE 133 TO 0.5 MILE SOUTH OF ROUTE 91 |
| QA Service Level | 1 (Verified on 08/02/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mohamad.yacoub@dot.ca.gov | Mohamad Yacoub | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 82 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-10-17-53 | 10/17/2023 | 10/17/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-16-41 | 10/16/2023 | 10/20/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-15-9 | 10/15/2023 | 10/15/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-11-81 | 10/11/2023 | 10/13/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-10-78 | 10/10/2023 | 10/13/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-09-62 | 10/09/2023 | 10/13/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-08-11 | 10/08/2023 | 10/13/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-05-63 | 10/05/2023 | 10/06/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-04-66 | 10/04/2023 | 10/06/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-03-88 | 10/03/2023 | 10/06/2023 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
