Project Details
This page displays current information for project DEA: 060X2704.
Project Information
| Project Identifiers | Project ID: 215374 DEA: 060X2704 EFIS: 0618000048 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-5-37.2/48.8 |
| Award Date | 05/11/2022 |
| Closeout Date | 05/09/2025 |
| Work Description | PAVEMENT REHABILITATION |
| Location Description | FROM 1.9 MILES NORTH OF THREE ROCKS ROAD UC TO 0.2 MILES SOUTH OF PANOCHE ROAD OC |
| QA Service Level | 1 (Verified on 12/16/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Cary.Cruz@dot.ca.gov | Cary Cruz | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 67 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-10-03-69 | 10/03/2022 | 11/09/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-10-02-8 | 10/02/2022 | 10/05/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-09-28-26 | 09/28/2022 | 09/30/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-09-26-43 | 09/26/2022 | 09/30/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-09-22-57 | 09/22/2022 | 09/30/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-09-21-48 | 09/21/2022 | 09/28/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-09-15-65 | 09/15/2022 | 09/26/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-09-15-64 | 09/15/2022 | 09/15/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-09-12-48 | 09/12/2022 | 09/15/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-09-11-4 | 09/11/2022 | 09/15/2022 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
