Project Details
This page displays current information for project DEA: 101J0104.
Project Information
| Project Identifiers | Project ID: 215317 DEA: 101J0104 EFIS: 1018000079 |
|---|---|
| DIST-CO-RTE-PM | 10-CAL,CAL-88,34-34.6/2.2 |
| Award Date | 05/19/2022 |
| Closeout Date | 11/16/2023 |
| Work Description | Construct fuel island canopies. |
| Location Description | In Calaveras and Alpine counties on Route 26 at the West Point Maintenance Station and on Route 88 at the Caples Lake Maintenance Station. |
| QA Service Level | 1 (Verified on 07/29/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| pawan.garg@dot.ca.gov | Pawan Garg | Resident Engineer | Caltrans RE DB |
| Brandon.Thurber@dot.ca.gov | Brandon Thurber | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 41-43 of 43 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-09-23-6 | 09/23/2022 | 09/26/2022 | Department Acceptance | SMTL TM3 - Fastener Assembly | View |
| 2022-09-23-5 | 09/23/2022 | 09/26/2022 | Department Acceptance | SMTL TM3 - Fastener Assembly | View |
| 2020-10-16-11 | 10/16/2020 | 11/18/2020 | Per Request | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
