Project Details
This page displays current information for project DEA: 081E5704.
Project Information
| Project Identifiers | Project ID: 214465 DEA: 081E5704 EFIS: 0814000051 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-10-27.7 |
| Award Date | 12/26/2019 |
| Closeout Date | 09/15/2021 |
| Work Description | PLACE CIDH PILING AND ROCK SLOPE PROTECTION |
| Location Description | RIVERSIDE COUNTY NEAR PALM SPRINGS AT WHITEWATER RIVER BRIDGE |
| QA Service Level | 1 (Verified on 02/28/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| shukri.abouazra@dot.ca.gov | Shukri Abouazra | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 41-46 of 46 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2020-06-16-3 | 06/16/2020 | Quality Control | SMTL TM5 - Welded Hoops | View | |
| 2020-06-11-3 | 06/11/2020 | 06/12/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2020-06-11-2 | 06/11/2020 | 06/12/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2020-06-11-1 | 06/11/2020 | Quality Control | SMTL TM5 - Welded Hoops | View | |
| 2020-06-02-2 | 06/02/2020 | 06/05/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2020-06-02-1 | 06/02/2020 | Quality Control | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
