Project Details
This page displays current information for project DEA: 120N3204.
Project Information
| Project Identifiers | Project ID: 214397 DEA: 120N3204 EFIS: 1213000196 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-91-R9.8/R18.9 |
| Award Date | 11/07/2019 |
| Closeout Date | 07/01/2022 |
| Work Description | CONST PRECAST SLAB REPLACEMENT, COLD PLANE AC PVMT AND PLACE RHMA. |
| Location Description | ORANGE COUNTY IN ANAHEIM AND YORBA LINDA FROM 0.3 MILE WEST OF LAKEVIEW AVENUE OVERCROSSING TO RIVERSIDE COUNTY LINE |
| QA Service Level | 1 (Verified on 12/02/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| dat.pham@dot.ca.gov | Dat Pham | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 63 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2021-01-26-16 | 01/26/2021 | 01/27/2021 | Quality Control | Concrete | View |
| 2021-01-22-13 | 01/22/2021 | 01/25/2021 | Quality Control | Concrete | View |
| 2021-01-21-31 | 01/21/2021 | 01/22/2021 | Quality Control | Concrete | View |
| 2021-01-20-35 | 01/20/2021 | 01/21/2021 | Quality Control | Concrete | View |
| 2021-01-18-13 | 01/18/2021 | 01/19/2021 | Quality Control | Concrete | View |
| 2021-01-15-12 | 01/15/2021 | 01/15/2021 | Quality Control | Concrete | View |
| 2021-01-13-34 | 01/13/2021 | 01/13/2021 | Quality Control | Concrete | View |
| 2021-01-11-15 | 01/11/2021 | 01/11/2021 | Quality Control | Concrete | View |
| 2021-01-08-5 | 01/08/2021 | 01/08/2021 | Quality Control | Concrete | View |
| 2021-01-06-25 | 01/06/2021 | 01/06/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
