Project Details

This page displays current information for project DEA: 08432724.

Project Information

Project IdentifiersProject ID: 210409
DEA: 08432724
EFIS: 0800020178
DIST-CO-RTE-PM08-RIV-8-RIV-15-6.4/9.7
Award Date05/01/2023
Closeout DateNot set
Work DescriptionCollector/distributor system, new on-ramps, bridges, RW, sound walls, drainage, signal and lighting, signage, freeway widening
Location DescriptionI-15 from Winchester Road to I-215 Junction in Temecula
QA Service Level2 (Verified on 06/24/2021)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
Mike.Bergevin@dot.ca.govMike BergevinResident EngineerCaltrans RE DB
jrojas@falcon-ca.comJuan RojasOversight Resident EngineerCaltrans REO DB
Arnel.Vega@dot.ca.govArnel VegaStructural RepresentativeCaltrans SR DB
swalker@falcon-ca.comScott WalkerOversight Structural RepresentativeCaltrans SRO DB
prakash.gowda@dot.ca.govPrakash GowdaDistrict Materials Engineer - Field Lab FontanaCaltrans District Materials Engineer
zihui.li@dot.ca.govZihui LiDistrict Materials Engineer - SRL PCC/Agg/Soils LabCaltrans District Materials Engineer
cristina.paredes@dot.ca.govCristina ParedesDistrict Materials Engineer - SRL HMA and Binder LabsCaltrans District Materials Engineer
sittampalam.sathiskumar@dot.ca.govSittampalam SathiskumarDistrict Materials Engineer - DesignCaltrans District Materials Engineer
kaushalkumar.talati@dot.ca.govKaushalkumar TalatiDistrict Materials Engineer - Field Lab Barstow and HesperiaCaltrans District Materials Engineer
brian.teh@dot.ca.govBrian TehDistrict Materials Engineer - SRL STS and Field Lab BlytheCaltrans District Materials Engineer

Samples

Samples submitted for this project.

Displaying 41-45 of 45 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2023-11-09-6811/09/202311/21/2023Quality ControlConcreteView
2023-11-07-8011/07/202311/21/2023Quality ControlConcreteView
2023-11-06-6011/06/202311/21/2023Quality ControlConcreteView
2023-11-16-3611/16/202311/16/2023Quality ControlConcreteView
2023-11-15-411/15/202311/15/2023Quality ControlConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods