Project Details
This page displays current information for project DEA: 101E2204.
Project Information
| Project Identifiers | Project ID: 210160 DEA: 101E2204 EFIS: 1015000011 COOP: 10439 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-580-13.3/13.8 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Widen existing road under I-580 to accommodate ramp widening and additional left turn lanes . Proposes to replace existing two lane bridge over the adjacent California Aqueduct on the east side of the Interchange and add two additional lanes |
| Location Description | Between I-580 and Old Schulte Road |
| QA Service Level | 2 (Verified on 01/30/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| RShackelford@Dewberry.com | Rob Shackelford | Resident Engineer | Caltrans RE DB |
| HZabell@Dewberry.com | Howard Zabell | Structural Representative | Caltrans SR DB |
| jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 51 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-06-11-81 | 06/11/2025 | 06/12/2025 | Quality Control | Concrete | View |
| 2025-06-11-75 | 06/11/2025 | 06/12/2025 | Quality Control | Aggregate | View |
| 2025-06-04-78 | 06/04/2025 | 06/04/2025 | Quality Control | Aggregate | View |
| 2025-04-25-41 | 04/25/2025 | 05/09/2025 | Quality Control | Concrete | View |
| 2025-05-23-29 | 05/23/2025 | 05/23/2024 | Quality Control | Aggregate | View |
| 2025-05-09-43 | 05/09/2025 | 05/12/2025 | Quality Control | Aggregate | View |
| 2025-04-30-54 | 04/30/2025 | 05/01/2025 | Quality Control | Concrete | View |
| 2025-04-30-53 | 04/30/2025 | 05/01/2025 | Quality Control | Aggregate | View |
| 2025-04-25-37 | 04/25/2025 | 04/28/2025 | Quality Control | Concrete | View |
| 2025-04-25-36 | 04/25/2025 | 04/25/2025 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
