Project Details
This page displays current information for project DEA: 07346304.
Project Information
| Project Identifiers | Project ID: 1000888 DEA: 07346304 EFIS: 0718000073 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-101-7.9/11.8 |
| Award Date | 04/28/2025 |
| Closeout Date | Not set |
| Work Description | INSTALL RUBBERIZED HOT MIXED ASPHALT. |
| Location Description | LOS ANGELES COUNTY IN THE CITY AND COUNTY OF LOS ANGELES FROM 0.1 MILE SOUTH OF PILGRIMAGE OVERCROSSING TO ROUTE 101/170 SEPARATION. |
| QA Service Level | 1 (Verified on 07/16/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Peter.Wang@dot.ca.gov | Peter Wang | Structural Representative | Caltrans SR DB |
| jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
| nader.gobran@dot.ca.gov | Nader Gobran | District Materials Engineer - Design | Caltrans District Materials Engineer |
| huey-min.tzou@dot.ca.gov | Huey-Min Tzou | District Materials Engineer - Field Tests | Caltrans District Materials Engineer |
| victor.zengler@dot.ca.gov | Victor Zengler | District Materials Engineer - Plant Services QC/QA | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 41-46 of 46 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-12-18-76 | 12/18/2025 | 12/18/2025 | Quality Assurance | Soil | View |
| 2025-12-18-75 | 12/18/2025 | 12/18/2025 | Quality Assurance | Soil | View |
| 2025-12-18-74 | 12/18/2025 | 12/18/2025 | Quality Assurance | Soil | View |
| 2025-12-15-11 | 12/15/2025 | 12/15/2025 | Quality Assurance | Soil | View |
| 2025-12-15-10 | 12/15/2025 | 12/15/2025 | Quality Assurance | Soil | View |
| 2025-12-15-9 | 12/15/2025 | 12/15/2025 | Quality Assurance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
